|
STS-108, Mission Control Center
Status Report # 06
Saturday, Dec. 8, 2001 – 7 a.m. CST
The crews aboard
Endeavour and International Space Station awoke this morning to begin
their first full day of joint operations following yesterday’s
docking between the two vehicles.
Pilot Mark Kelly
and Mission Specialist Linda Godwin will work together to remove the
Raffaello Multi-Purpose Logistics Module from Endeavour’s payload
bay and attach it to the Unity node of the International Space Station.
Over the course of about three hours, Kelly will use the shuttle’s
robotic arm to gently lift Raffaello from the payload bay and maneuver
it into place, securing it to the Earth-facing berthing port on the
Unity module about 12:39 p.m. CST today.
As Kelly works
to install the Raffaello module, the formal exchange of space station
crews will occur as the Expedition Three crew – Commander Frank
Culbertson, Pilot Vladimir Dezhurov, and Flight Engineer Mikhail Tyurin
– and the Expedition Four crew – Commander Yury Onufrienko,
and Flight Engineers Carl Walz and Dan Bursch, exchange their customized
seat liners in the Russian Soyuz spacecraft. As each Expedition Four
crew member’s seatliner is installed in the Soyuz and checked out,
he officially becomes a resident of the space station with the Expedition
Three crew member moving over to become a member of the Endeavour crew.
Handover briefings between the crews will continue throughout docked
operations.
Mission Specialist
Dan Tani will focus his attention on transferring equipment from Endeavour
to the space station while Commander Dom Gorie tends to vehicle operations.
The three commanders
onboard – Gorie, Culbertson and Onufrienko – along with Endeavour’s
Pilot Kelly will participate in media interviews at 3:44 p.m. CST. MSNBC,
CBS News and WAGT-TV in Augusta, Georgia will have the opportunity to
interview the crewmembers in the station’s Destiny laboratory.
Two payload bay
experiments located in the Multiple Application Customized Hitchhiker-1
(MACH-1) facility have already completed 50% and 76% of their mission
objectives. Those experiments are the Capillary Pumped Loop Experiment
(CAPL) and the Prototype Synchrotron Radiation Detector (PSRD) respectively.
The CAPL demonstrates a multiple evaporator capillary pumped loop system
and the PSRD measures cosmic ray background data.
The next STS-108
mission status report will be issued at about 6 p.m. CST today or as
events warrant.
###
NASA Johnson Space Center Mission Status Reports and other information are available automatically
by sending an Internet electronic mail message to majordomo@listserver.jsc.nasa.gov.
In the body of the message (not the subject line) users should type
"subscribe hsfnews" (no quotes). This will add the e-mail address that
sent the subscribe message to the news release distribution list. The
system will reply with a confirmation via e-mail of each subscription.
Once you have subscribed you will receive future news releases via e-mail.
|